Home /  News /  Company news
Precautions are required when installing the heat pump host
2019-03-07

The host is the most basic working requirement of a heat pump, and it is also the most essential part, which can also be said to be the most important part. Therefore, its installation and use of the working environment require our special attention, and it is the most valuable part of the air energy heat pump, and its installation environment is directly related to its service life.  

20190902023622232.png

If it is necessary to install on the roof and other high platforms, it is also necessary to take into account the wind direction and other factors at the location, and have good lightning protection measures; If it is necessary to install on the ground, it is also necessary to avoid the air energy heat pump in the strong air outlet position, and it is necessary to do 200MM installation foundation, and thicken the rubber shock cushion of 10~20MM to ensure the use and installation during operation.

There are also some things such as the following points that we need to need and raise our vigilance:

The operation panel should be installed in a place where it is easy to observe the operation and should not be installed in a place with water and humidity.

The control line is embedded to the main engine side with a conduit.

The host should be installed near the power supply and water source to facilitate cable distribution and pipe distribution.

Do not install the host in a polluted or dusty place.

There should be no strong heat source and exhaust ports of other equipment around the host, no corrosive and combustible gases.

The distance between the outdoor host and the surrounding walls or other placed objects shall not be less than the distance indicated in the figure below.

The main box and the hot water tank should be as close as possible, the distance should not be greater than 5m, and the height difference between the main machine and the heating water tank should not be greater than its external head.

There should be downspouts near the main engine to discharge the condensate generated during the working process.

There should be an independent socket near the host that matches the power of the host.




Address:Zone B, Happy Industrial Park, Xinji Village, Nancun Town, Panyu District, Guangzhou
  • Trill
  • Deft hand
  • Video
  • Account
Copyright © Guangzhou Colant thermal technology Co., LTD All rights reserved  Yue ICP 18097569-1